News

sa573gr.70 steel flat bar manufacturing plant

sa573gr.70 steel flat bar manufacturing plant

  • Mar 12 , 2021
Q370qC, Q370qD, sa573gr.70 steel flat bar and Q370qE are structural steel plates for bridges. It is required to have high strength, toughness and to withstand the load and impact of rolling stock, and have good fatigue resistance, certain low temperature

Q370qC, Q370qD, sa573gr.70 steel flat bar and Q370qE are structural steel plates for bridges. It is required to have high strength, toughness and to withstand the load and impact of rolling stock, and have good fatigue resistance, certain low temperature toughness and atmospheric corrosion resistance. The steel for tie-welding bridges should also have good welding performance and low notch sensitivity. Used for the production of riveted and bolt-welded road bridges and railway bridges (including cross-sea bridges).

The ability to resist plastic deformation and fracture under the action of external load is called sa573gr.70 steel flat bar strength, and the local resistance of solid materials to external objects such as indentation and scribing is hardness. In the mechanical properties of weathering steel, strength and hardness are related indexes, while plasticity (elongation, reduction of area) and toughness (impact value) are related indexes.

The secondary quenching and low temperature tempering of sa573gr.70 steel flat bar, wear-resistant composite plate is mainly used for important carburized parts with high mechanical properties, especially for coarse grain steel. However, after carburizing, it needs to be heated twice at high temperature to increase the deformation and oxidation decarburization of the workpiece.

When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.

Leave A Comment