In line with the service concept of "honesty first, customer first" and the service tenet of "all for customer satisfaction", the company adopts the acceptance and response mode of combining manual and automatic, and accepts the divers
In line with the service concept of "honesty first, customer first" and the service tenet of "all for customer satisfaction", the company adopts the acceptance and response mode of combining manual and automatic, and accepts the divers
In line with the service concept of "honesty first, customer first" and the service tenet of "all for customer satisfaction", the company adopts the acceptance and response mode of combining manual and automatic, and accepts the diversified service demands of customer business consultation, complaint declaration, business acceptance, etc. through telephone, fax, e-mail, visit, letter, etc.
Different form SA573 Grade 58 structural steel cost, boiler steel plate is one of the most critical materials in boiler manufacturing. Boiler steel plate mainly refers to the hot-rolled special carbon steel and low alloy heat-resistant steel plate used to manufacture important components such as the shell, drum, header end cover, support and hanger in the boiler. Boiler steel plates are often working under medium, high temperature and high pressure. In addition to withstand higher temperatures and pressures, boiler steel plates are also subject to impact, fatigue loads, and water and gas corrosion, resulting in poor working conditions.
Box making, door-to-door: fill in the packing plan: box making time, ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, door point, contact person, telephone number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date). Internal loading: fill in the packing plan: ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, cabin number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date).
No. 45 steel is commonly used medium carbon quenched and tempered structural steel. The cold plasticity of No. 45 steel is generally better than SA573 Grade 58 structural steel cost. Annealing and normalizing are better than quenching and tempering. No. 45 steel has higher strength and better machinability than Q345 steel. After proper heat treatment, it can obtain certain toughness, plasticity and wear resistance. No. 45 steel SA573 Grade 58 structural steel cost is suitable for hydrogen welding and argon arc welding, but not suitable for gas welding. Preheating is required before welding, and stress relief annealing shall be conducted after welding.
Leave A Comment