FAQ

Is ASTM A573 gr 65 high strength steel plate hot or cold rolled?

Is ASTM A573 gr 65 high strength steel plate hot or cold rolled?

  • Dec 23 , 2020
The whole plant covers an area of 18,480 square meters, a workshop area of 9,500 square meters, and a final assembly workshop of 4,300 square meters; fixed assets are 25.50 million yuan. The company has ASTM A573 gr 65 high strength steel plate strong tec

The whole plant covers an area of 18,480 square meters, a workshop area of 9,500 square meters, and a final assembly workshop of 4,300 square meters; fixed assets are 25.50 million yuan. The company has ASTM A573 gr 65 high strength steel plate strong technical force, complete quality assurance system sophisticated tooling equipment and advanced technology. It can provide high efficiency professional equipment and ASTM A573 gr 65 high strength steel plate pressure vessels for domestic and foreign chemical, petroleum, chemical, metallurgical, pharmaceutical, fertilizer, textile, and environmental protection industries.

Q345B material is a low-carbon alloy steel (c <0.20%), with good overall performance, low temperature performance, cold stamping performance, welding performance and machinability. Q345R steel is a special plate for pressure vessels with a yield strength of 345MPa. It has good comprehensive mechanical properties and technological performance. In addition to the tensile strength and elongation requirements higher than Q345 (16Mn) steel, Q345R is also required to ensure impact toughness.

For a ship, the choice of medium and thick ship plate is very important, it is an important part of the ship frame. The pressure bearing capacity of ASTM A573 gr 65 high strength steel plate, medium and thick ship plates is very strong. Secondly, because it is a ship plate, it must be driven in water, so of course the corrosion resistance is better, otherwise it will bring danger to buyers. Moreover, the service life of the ship will be increased. Regular inspection of the ship plate can ensure the safety of sailing. You can also know whether the ship plate is defective, so you don't have to worry about water seepage when you sail.

ASTM A573 gr 65 high strength steel plate, Q345B low alloy steel plate composition:
1) Low carbon: Due to the high requirements for toughness, weldability and cold forming properties, its carbon content does not exceed 0.20%;
2) Add manganese-based alloying elements;
3) Adding auxiliary elements such as niobium, titanium or vanadium: a small amount of niobium, titanium or vanadium forms fine carbides or carbonitrides in the Q345B steel, which is conducive to obtaining fine ferrite grains and improving the strength and toughness of the steel;
In addition, adding a small amount of copper (≤0.4%) and phosphorus (about 0.1%) can improve the corrosion resistance. Adding a small amount of rare earth elements can desulfurize and degas, purify steel, improve toughness and process performance.

The requirements for toughness impact energy of ASTM A573 gr 65 high strength steel plate, S355JR steel and S355J2 steel are different, other mechanical properties and various requirements are the same.S355JR steel toughness impact energy requirements: 20 ℃, impact energy ≥ 27JS355J2 steel toughness impact energy requirements: - 20 ℃, impact energy ≥ 27JAs the temperature decreases, the impact energy of the same steel will gradually decrease, so S355J2 steel is more expensive than S355JR steel.

We have huge stocks for carbon steel plates, high strength low alloy steel materials, weather resistant steel sheets, wear resistant steel plates, boiler plates, pipeline steel, etc. Those stocks can be delivered within 10 days after deposit. We update ASTM A573 gr 65 high strength steel plate stock list regularly. But the stock changes quickly. It needs to check with warehouse specially when you have urgent needs. Welcome to contact us and book steel materials stocks.

When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.

Leave A Comment